Project Description

5204 Fallbrook Ave, Woodland Hills

Soft story Flagpole cantilever retrofit of building. Project includes fabrication and installation of two (2) W10x100 cantilever columns, field welding of ¼” x 5 ½” continuous steel strap, including templates, anchor bolts. Each column is supported by a footing that is 48” x 48” x 24” pad which is poured beneath a grade beam that is 36” x 30” x 25’ (x 2). Scope included, demolition of stucco per plans, blocking, framing, patching of stucco and painting.    Saeed Banaie, DSN Group, Inc. – (424) 248-0636